Lebanon
Railway Tripoli-Chekka
| Project Description |
New railway infrastructure for the Port of Tripoli to Chekka (around 20 Km). |
| Progress Stage |
Prefeasibility study finalized. |
| Specific Needs |
Feasibility study, considering that this railway section will be integrated in a railway line from Beirut to the Syrian border. |
| Technical Assistance |
1. ToR for the Feasibility study done and approved, 2. Technical Assistance for Project Management, 3. Assistance for funding. |
Port of Jounieh
| Project Description |
Upgrading the Port of Jounieh in order to receive cruise ships up to 250 meters in length. |
| Progress Stage |
Prefeasibility and Feasibility studies finalized. |
| Cost |
90 Million Euros (40 Million $ already reserved of the Lebanese National budget). |
| Specific Needs |
Detailed design (around 1.5 Million $) and tender documents. |
| Technical Assistance |
1. Supervision of the Detailed Design, 2. Assistance for funding, 3. Tender documents. |
National Coordinator
- Academic background
B.Sc. in Civil Engineering
- Current position
Director General of Land Maritime Transport
Ministry of Public Works and Transport